2024-02-22 Steel can be recycled any number of times without loss of quality or strength. Steel building components are fabricated under factory-controlled conditions with minimal waste (off-cuts are recycled as scrap). As the site activity is mainly assembly, there is rarely any waste on site.
Read More 2021-01-09 Steel structure worskhop of Huajian Aluminum Group
Read More 2020-11-23 This steel structure workshop building is a project that we manufacture in 2018,the delivery time is 40 days,this is a very complicated project as its have modeling , The engineer of this project are very satisfied with our quality and service.
Read More